Madara Coatings

For owners, facility managers and general contractors who can't close for a floor. Coated around your hours, to spec.

Mirror-gloss metallic epoxy floor in a commercial lobby

CommercialFloors

Built for the business

A commercial floor has a harder job than it looks: carts, forklifts, cleaners and inspections, every day, for years.

We start with the slab. Moisture readings, hardness and existing coatings decide the system, not a catalogue.

Then we plan the install around the building: which zones close, for how long, and who needs to know.

You get one written scope with the system, thickness, prep and schedule before work starts.

Urethane cement floor in a commercial kitchen

Spaces we coat

The Atchafalaya Basin Bridge on I-10, the road east out of Lafayette.
High-build epoxy sample board
Sample board: high-build epoxy. Physical chips come to the site walk.

Pick your space

High-build epoxy

Thick, jointless epoxy over diamond-ground concrete, with aisle lines and keep-clear zones coated in. Built for forklifts and pallet jacks all shift.

Coated zone by zone so freight keeps moving.

How a floor gets made

The same six stages on a two-car garage and a distribution center. The ones nobody sees decide how long the floor lasts.

We measure, look at traffic, chemicals, drains and heat, and ask how your operation runs before we name a system.

Commercial questions

Bidding a
project?

Send plans, a spec section or just the square footage. We schedule a site walk and send a written bid. Or call (337) 242-7629.

Request a bid →